Step 4 - |
In the large text box on the left enter the
following:
$(upper,$(edtime, $(getvar, tdcreate),MON. DD YYYY))
The above Diesel expression creates a value based on the date
the drawing files was created on and the result looks like:
MAR. 8 2004
$(edtime, $(getvar, tdcreate),MON. DD YYYY)
The above Diesel expression creates a value based on the date
the drawing files was created on and the result looks like:
Mar. 8 2004
|